Thursday, 02 January 2014 13:22

Possible Delay for CVN 03JAN Newscast Due To Power Failure.

 

 CVN MAY be delayed on 03JAN due to a massive power failure resulting from a storm last night. The power has been off at my location so far all day. I have used up almost all of the battery, and I do not have enough to produce the show for Friday evening. I will do my best to get the show uploaded as quickly as possible, if I am unable to run the show Friday evening.

If the power is restored Thursday afternoon, I may still have enough time to write/produce everything for the show on Friday.  If not, will do my best to get the show uploaded as quickly as possible when I have the power to do so.

I apologize for the inconvenice, and thank you for your continued support!

 

 

Sacred Geometry star

Read 2481 times
Go To Top